9.5-acres on Columbia Point, facing across Dorchester Bay to the Boston skyline, to Boston Harbor and further east, to the open sea

Index to Projects in Massachusetts

Boston, Massachusetts

Gross Area
113,000 s/f

Client
John Fitzgerald Kennedy Library, Inc.,    Columbia Point, Boston, Massachusetts

Time Frame
Master planning: 1966–
Planning: 3/76–
Construction: 8/77–
Completion: 10/79
Extension completed 5/91

John Fitzgerald Kennedy Library

Boston, Massachusetts
Completed 1979
Extension Completed 1991

 

Lead Designer: I. M. Pei

 

A presidential library and museum facility
 

Click on image to enlarge

The Kennedy Library was erected on a landfill site overlooking Boston, Dorchester Bay, and the ocean beyond. To overcome existing conditions, the site was raised 15 feet and planted with beach grasses to recall Kennedy's love of the sea. Within a limited space and budget, the design had to fulfill a complex-mixed use program while symbolically remembering the late young president in terms both contemporary and timeless. A split-level design was developed, organizing museum spaces in a layer below ground, with key emotive elements dramatically isolated above.

The solution consists of a triangular 10-story tower housing archival, educational and administrative functions, a two-story base containing exhibition space and two 300-seat theaters, and a 110-foot high memorial pavilion, which gives coherence and focus to the whole. After viewing a film about Kennedy's life, visitors descend into linked exhibition areas highlighting the president's family and administration. From this darkened setting they emerge into the sun-filled, silent void of the space-framed glass pavilion. Except for an enormous American flag suspended above, the space is empty to allow the viewer to contemplate what he has seen and experienced against a great panorama of sky, land and open sea.

In 1991 a 21,000 s/f multifunction waterfront addition was constructed to support the library's active educational and cultural programs.

 

Major Components

Presidential library and museum facility with exhibition spaces, two auditoria, a research center, archives, and administrative offices

 

Awards

1986

Adaptive Environment Center: The Best of Accessible Boston: Commendation Award

 

1980

Prestressed Concrete Institute Award


 

I. M. Pei & Partners services

Site Selection; Complete Architectural Services; Interior Design

 

Exhibit Designers

Chermayeff & Geismar Associates, New York, NY

 

Landscape

Office of Dan Kiley, Charlotte,  VT

 

Traffic / Site

Travers Associates, Clifton, NJ

 

 